English हिन्दी
Connect with us

India News

Nagaland News: Naga Hoho urges permanent border settlement, 4 nabs on kidnapping, graft in construction hospital at CIHSR

The Naga Hoho has urged the newly-formed 10-member committee on border affairs, under the chairmanship of Chief Minister Neiphiu Rio, to accelerate the matter of border issues and bring about a permanent settlement.

Published

on

Nagaland Chief Minister Neiphiu Rio

The Naga Hoho has urged the newly-formed 10-member committee on border affairs, under the chairmanship of Chief Minister Neiphiu Rio, to accelerate the matter of border issues and bring about a permanent settlement.

The Hoho pointed out that Assam-Nagaland border was in conflict due to arbitrary demarcation by the then British government without the consent of the people. The organisation asserted the importance of historical accounts claiming that the then Naga occupied areas were not included in the creation of new Nagaland state due to which the decision of the Government of India to demarcate boundaries of the North Eastern states through imaginary satellite would not be justifiable to the people. Further, it stated that the issue would be resolved through India’s strong political will along with mutual relationship between the North Eastern states.

Dimapur police nabs 4 persons on charges of kidnapping

Under a case filed by a victim with the East Police Station in Dimapur on charges of abduction and illegal detention by unknown people for four days in an unknown location, Dimapur police reported that four persons were arrested and have have been identified as Semato Shohe, Leacy NSCN (I-M), Ahuka Yeptho, Secretary NSCN (I-M), Sunjemtoshi Aier and Supong Ao. PRO Dimapur police and additional deputy commissioner of police (ADCP) Crime stated that the arrests were made on different dates. The PRO informed, the issue originated from the victim’s inability to pay back a loan amounting to several lakhs of rupees to a local credit society.

Corruption in building 300-bed Covid hospital, says Rising People’s Party

The Rising People’s Party (RPP) alleged mismanagement in the construction of 300-bedded Covid hospital at Christian Institute of Health Sciences and Research (CIHSR) in Dimapur on Tuesday. As per report, after the party members visited the under-construction COVID hospital, they alleged that the construction of the hospital was mired in corruption as pointed out by MLA Imkong L. Imchen and the NPF Legislature Party. The RPP alleged that Rs 30 crore was sanctioned for the construction by which a two-storey building could be constructed easily within Rs.10 crore.

Read Also: Mizoram News: Essential supplies resume, meeting on Beti Bachao, Mizo pharmacists donate Covid essentials

The RPP expressed that with the sanctioned amount, state government could have constructed at least two 300-bedded hospitals for the state. They also enquired about the project expenditure head of the construction and questioned about the implementation of the project without any discussion in the Cabinet. The party demanded the People’s Democratic Alliance (PDA) government to immediately clarify the points raised for the issue.

India News

Air India sacks Phuket-Delhi flight pilot after failing drug test

Air India has terminated the Phuket-Delhi flight pilot after a confirmatory test found a psychoactive substance following the August 4 incident.

Published

on

Air India has terminated the employment of the pilot-in-command of a Phuket-Delhi flight after he tested positive for a psychoactive substance.

The pilot was in command of flight AI2379, which was travelling from Phuket to Delhi on August 4 when the aircraft suddenly lost altitude over Odisha. The incident left 24 passengers injured.

Air India said the termination was in line with its zero-tolerance policy regarding safety violations and regulatory requirements.

Air India terminates pilot with immediate effect

In a statement, the Tata-owned airline said the pilot-in-command had tested positive for a psychoactive substance.

The airline said that, considering its zero-tolerance approach to violations related to safety, fitness and regulatory requirements, the pilot’s employment had been terminated with immediate effect.

Air India also said it continues to cooperate fully with the investigation into the incident and has provided access to relevant operational, maintenance and technical records.

What happened on the Phuket-Delhi flight?

According to the preliminary findings of the Aircraft Accident Investigation Bureau (AAIB), the Airbus A320 was carrying 145 people when it experienced the near-simultaneous loss of all three hydraulic systems while cruising at around 36,000 feet.

The technical failure resulted in the autopilot disconnecting and triggered a brief stall warning. The aircraft subsequently lost altitude, resulting in injuries to 24 passengers.

The preliminary report also noted that the pilot tested non-negative for a psychoactive substance in a confirmatory test.

However, the report did not establish that the pilot’s drug-test result caused or contributed to the hydraulic system failure or the subsequent loss of altitude.

AAIB recommends action over psychoactive substance finding

The AAIB described the confirmation of psychoactive substance use as a serious concern and recommended that the Directorate General of Civil Aviation (DGCA) take appropriate action against the pilot on priority.

The investigation into the technical and other aspects of the incident is still underway.

The preliminary report also noted that the co-pilot was flying the aircraft when the incident occurred and attempted to bring the situation under control.

Air India said safety remains its highest priority and that its pilots undergo training, proficiency checks, medical examinations and other regulatory assessments in accordance with applicable requirements.

Continue Reading

India News

India offers forensic DNA support to identify Nepal flood victims

India will make forensic laboratory facilities available for DNA profiling of first-degree relatives of people missing after Nepal’s August 26 flash floods.

Published

on

India has offered forensic laboratory support to help identify people who remain missing after the devastating flash floods in Nepal.

The Ministry of External Affairs (MEA) said central and state forensic laboratories in India will make their DNA profiling facilities available for first-degree biological relatives of people missing after the August 26 flash floods in Nepal.

DNA samples can be provided by relatives in India

According to the MEA, first-degree biological relatives living in India can have their biological samples collected and DNA profiles prepared.

The relatives can include a person’s father, mother, son, daughter or sibling. DNA profiling can be carried out at Central Forensic Science Laboratories (CFSLs), State Forensic Science Laboratories (SFSLs), laboratories of the National Forensic Sciences University (NFSU), and NABL-accredited laboratories with DNA profiling capabilities.

The initiative is intended to support Nepal’s ongoing process of identifying mortal remains recovered after the flash floods.

DNA profiles to be compared with unidentified remains

The MEA said the DNA profiling may use Autosomal STR DNA profiling, as advised by Nepal Police, subject to the technical requirements communicated by the Nepali authorities.

Once prepared, DNA profiles and the preliminary information required by Nepalese authorities can be sent to Nepal Police by email for comparison with DNA profiles obtained from unidentified mortal remains.

The Indian Embassy in Kathmandu will also facilitate coordination, with copies of the DNA profiles to be shared with the embassy for this purpose.

Nepal flood death toll rises

The death toll from the flash floods has risen to at least 1,259, according to Nepalese authorities, after rescue workers recovered additional bodies from affected areas.

More than 12,000 people have been rescued, while around 5,000 people remain missing as search and rescue operations continue.

The flash floods, which followed an ice-rock avalanche near the Nepal-Tibet border, caused extensive destruction across towns and villages in northern and central Nepal.

Continue Reading

India News

PM Modi hails ISRO after successful GSLV-F17 launch, calls it proud moment

PM Modi congratulated ISRO after GSLV-F17 successfully launched EOS-05, calling the achievement a proud moment for India.

Published

on

Prime Minister Narendra Modi on Friday congratulated the Indian Space Research Organisation (ISRO) after the successful launch of the GSLV-F17 rocket carrying the EOS-05 Earth observation satellite, describing the achievement as a proud moment for the nation.

The GSLV-F17 lifted off at 2:55 a.m. IST from the Satish Dhawan Space Centre in Sriharikota, Andhra Pradesh. The EOS-05 satellite was subsequently placed into its designated sub-geosynchronous transfer orbit.

PM Modi praises ISRO’s growing capabilities

In a post on X, PM Modi said the successful mission reflected the excellence, innovation and expanding capabilities of India’s space sector.

He also highlighted the growing partnership between ISRO and Indian industry, saying it was strengthening India’s space programme and expanding capabilities across the wider space ecosystem.

The prime minister described the successful launch of GSLV-F17 carrying EOS-05 as another outstanding achievement by ISRO and a matter of national pride.

EOS-05 strengthens earth observation capabilities

According to the report, EOS-05 is India’s first-ever imaging satellite from geosynchronous orbit. The satellite is designed to provide continuous observation of the country from an altitude of nearly 36,000 km above Earth.

The mission is expected to strengthen India’s earth observation capabilities and support advanced imaging and observation applications.

ISRO Chairman Dr V Narayanan expressed satisfaction with the mission, saying the satellite was precisely injected into its intended orbit.

Mission Director Thomas Kurian described the launch as a significant milestone for the GSLV programme. He said it was the 19th flight of the GSLV and noted that EOS-05 is the heaviest satellite the launch vehicle has placed into a geosynchronous transfer orbit or sub-GTO orbit.

GSLV-F17 launch vehicle details

The GSLV-F17 stands 51.7 metres tall and has an approximate liftoff mass of 420.5 tonnes.

Science and Technology Minister Jitendra Singh also congratulated the ISRO team following the successful mission. He described EOS-05 as a state-of-the-art Earth observation satellite capable of advanced imaging across visible, infrared, multispectral and hyperspectral bands.

Continue Reading

Trending

© Copyright 2022 APNLIVE.com